Plan switchgear procurement at the start of the project, not after rough-in. Confirm amperage requirements early, track the equipment lead time in the master schedule, and keep an in-stock sourcing option in reserve.
Confirm requirements early
The amperage and configuration your project needs should be settled with the engineer of record as early as possible. Late changes to equipment requirements reset procurement clocks.
Once requirements are set, get the order conversation started immediately — even a few weeks of delay at this stage compounds downstream.
Build the lead time into the schedule
Put the switchgear delivery date in the master schedule with the same weight as concrete or steel milestones. If the lead time is 11 to 20 weeks, everyone should see what that means for energization.
If the delivery date lands too late, look at in-stock equipment before accepting the slip. Available inventory can remove the wait entirely, subject to current stock.
Talk to us about available units
IJ Switchgear carries 600A switchgear alongside 400A and 800A units. Request a quote or call (480) 220-3939.
Frequently asked questions
When should switchgear be ordered on a commercial project?
As early as the design allows. Requirements confirmed late push delivery late.
Can in-stock switchgear replace a long-lead order?
Yes, when the available unit matches the project's requirements. Contact us to confirm current inventory.

