Arizona construction

Keeping Commercial Projects on Schedule in Arizona's Construction Boom

Arizona's construction volume rewards teams that control their long-lead items. Switchgear is one of the biggest — here is how to manage it.

4 min read

Steel and concrete commercial building under construction with mountains behind

In Arizona's busy construction market, schedule control comes from managing long-lead items early. Switchgear lead times of 11 to 20 weeks make it one of the first procurement conversations every project should have.

Long-lead items decide schedules

On a busy Arizona job, the trades are rarely the constraint — equipment is. Switchgear, with typical lead times of 11 to 20 weeks, sits near the top of that list.

Teams that treat equipment procurement as a day-one task protect their energization dates. Teams that wait inherit whatever the supply chain gives them.

Options when the lead time does not fit

When the standard lead time lands after your required date, in-stock equipment is the most direct fix. Available inventory removes the manufacturing wait entirely.

IJ Switchgear is based in Phoenix and carries 400A, 600A, and 800A JMT Electric switchgear, subject to current availability.

Check current inventory

Browse our 400A switchgear or request a quote. Call (480) 220-3939 to talk with Jason Briggs.

Frequently asked questions

What is the biggest equipment schedule risk on commercial jobs?

Long-lead electrical equipment, including switchgear with typical 11 to 20 week lead times.

How can in-stock switchgear help?

It removes the manufacturing wait, subject to current availability matching your project's requirements.