Denver and California builders face switchgear lead times of 11 to 20 weeks on standard orders. In-stock inventory from a regional supplier lets project teams skip the wait and hold their schedules.
Two markets, one constraint
Denver's steady commercial pipeline and California's sheer project volume both pull hard on electrical equipment supply. The result is the same: long quoted lead times on switchgear.
For project teams in either market, the question is not whether the lead time exists — it is whether the schedule can absorb it.
A regional alternative
IJ Switchgear serves Colorado and California alongside Arizona and Nevada. We buy and sell JMT Electric switchgear with 400A, 600A, and 800A units available now, subject to current availability.
A phone call confirms whether current inventory matches your project's requirement — a much shorter conversation than a 20 week wait.
Confirm availability for your build
See our 600A switchgear or request a quote. Call (480) 220-3939 to reach Jason Briggs.
Frequently asked questions
Does IJ Switchgear serve Denver?
Yes. Colorado is one of our four service states, including the Denver market.
Does IJ Switchgear serve California?
Yes. California is one of our four service states.

